Success stories that we developed and launched

Cuby House

Cuby house Our team has developed the construction technology CUBY CONSTRUCTION, which allows to construct residential and public buildings quickly, efficiently and cheaply. We developed the technology that is environmentally […]

Copper smelter

Multiphysics computer simulations project of the industrial copper smelter and it’s engineering optimization for liquid phase bubbling of slags and fume exhaust system. The results, were integrated in plant modernisation and dramatically reduced the smelter down-time.

Hot Water Monitoring

R&D project in thermophysics, embedded algorithms, mechanical + electronics design with multiple on-site tests. The final product controls, regulates, measures and monitors in real time thermal energy flow and hot water supply in industrial and residential heating system.

Frequency converter

A frequency converter with power up to 4 KW developed from scratch. R&D included special test benches design and specific power electronics testing. The final frequency converter reached IP67 protection level.

Gas burner

Heat transfer computer simulations and design of the new type ceramic gas burner employing IR-irradiation effect. The novel gas burner design demonstrated superior efficiencies and advanced customer’s R&D efforts in bringing their new product to the market.